Well since I was sick, I didn't get much done on the list, so here it goes again.
Clean up basement.
Design/buy/build shelving for front wall in the basement - Design done
move everything from upstairs to shelving in the basement
move all tools from Garage to basement
clean up and organize tools
install new mailbox
Done - install indoor/outdoor thermo One set Kitchen and outside, other set master bedroom and ricky's room
clean up garage
park one car in the garage (it is only a one car garage ;))
Done - return belt to wilson's leather
Done - get battery changed in tigger watch
Done - Look into new door between Garage and house - All Steel auto close
Done - Look at Garage plans/models
Pick up Garage door opener from parents
Install new (to us) garage door opener (wish list)
1/15/2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment